ARQEN LABS
START A PROJECT →

[ APPLIED SYSTEMS ENGINEERING · 11 INDUSTRIES · ZURICH & WARSAW ]

EST. 2019 · 24 ENGINEERS

THE WHOLE
SYSTEM, one TEAM

Most projects lose time where one supplier hands over to the next. We cover the whole path, from the equipment in the field to the screen someone makes decisions on, so there are fewer handovers to go wrong.

By the numbers

14m

DATA POINTS A DAY MOVE THROUGH WHAT WE BUILD

[ 01 ]

55 days median from kickoff to the first production release.

[ 02 ]

99.98% uptime across managed workloads, independently audited in 2025.

one team, whole path

NO INTEGRATOR IN THE MIDDLE.
NO SEAM TO ARGUE OVER.

[ HOW A PROJECT ACTUALLY RUNS ]

TAP A STAGE

stage 01

OUT IN THE FIELD

Something happens in the physical world and has to be captured reliably by equipment nobody visits often. Getting this right decides how much everything downstream can be trusted.

[ WHAT WE TAKE ON ]

TAP A ROW · NO SUBCONTRACTORS

[ SELECTED WORK · CLIENTS UNDER NDA ]

TAP FOR DETAIL

[ WHY CLIENTS CALL ]

the second attempt has to work

Most of this work arrives after a first attempt stalled: three suppliers, no single owner, and a deadline that has already moved once. We take the whole path and one accountable line.

1CONTRACT, WHOLE PATH
0SUBCONTRACTORS

How we work

WEEK 1

TEARDOWN

We read the firmware, the queries, the incident log and the tickets, then hand you a written map of what is actually running and where it leaks.

WEEK 2 — 3

thin slice

One reading travels from the device to a screen someone uses, live behind a flag. If the path cannot hold that, no roadmap will save it.

WEEK 4 — 12

BUILD OUT

Weekly deploys against a fixed scope. Tests, runbooks and dashboards land with the code, not in a later phase.

THE MODEL

set to suit you

Full handover, shared ownership or an ongoing managed service. We set that at the start and write it down, so nobody is surprised at the end.

[ THE LAB ]

BREADTH IS
PRACTISED, NOT
claimed

Two days a month are unbilled and spent on open tooling, benchmarks and write-ups. It is how a small team stays current across the whole path instead of expert in one part of it.

Field notes, monthly. Numbers, failures and method.

Written by whoever was on call.

[ WHERE IT RUNS ]

11 INDUSTRIES

ENERGY & GRID

MONITORING · FORECASTING

logistics

ROUTING · FLEET OPERATIONS

MANUFACTURING

LINE CONTROL · QUALITY

public utilities

NETWORK MONITORING · BILLING

FINANCIAL DATA

TIME-CRITICAL DATA

healthtech

DEVICE AND RECORDS INTEGRATION

AGRITECH

REMOTE SENSING · YIELD

mobility

IN-VEHICLE · REMOTE UPDATES

Also telecoms, defence electronics and marine survey. Regulated, safety-critical and audited environments are the normal case here.

A substation, a factory line and a trading feed pose one problem in three dialects. Having shipped all three is why the second week is faster than the first.